August - September 2011 Updates
September 2011 - Building 6 Entry
September 2011 - Building 6 Lobby
September 2011 - Building 1 Open Area
Jobsite Activity
Building 1 - Painting, Casework, Ceiling Grid
Building 2 - Painting, MEP Rough-In at Ceilings, Ceiling Grid
Building 3 - Mechanical Controls, MEP Rough-In at Ceilings, Prime Paint
Building 4 - Drywall & Tape, Mechanical Controls, MEP Rough-In at Ceilings, Prime Paint
Building 5 - Drywall & Tape, MEP Rough-In at Walls, Door Frames
Building 6 - Ceiling Grid, Ceramic Tile, Elevator, Plumbing Fixtures and Trim
Building 7 - MEP Overhead Rough-In, Terminate Devices, Ceiling Grid, Ceramic Tile
Sitework - Steel erection at walkways, grading and planters at Neighborhood gardens