September 2010 - Building 6 Footing Excavations
Bid Documents and Bid Dates
9/8/2010: Bid Package #3 Addendum #6 Posted to Website.
9/9/2010: Bid Package #3 Addendum #7 Posted to Website (Revises Bid Dates)
9/15/2010: Bid Package #3 Addendum #8 Posted to Website
9/16/2010: Revised Bid Date for Bid Package #3 (2:00PM)
- 3A - Acoustical Ceiling and Wall Panels (9/16/2010)
- 3B - Tile (Ceramic and Quarry) (9/16/2010)
- 3C - Resilient Flooring and Carpet Tile (9/16/2010)
- 3D - Painting and Wall Coverings (9/16/2010)
9/17/2010: Bid Opening at Project site for packages 3A-3D (11:00AM)
9/22/2010: Updated OCIP Manual and Safety Standards posted to Website
9/24/2010: Bid Package #3 Addendum #9 Posted to Website (Revises Bid Dates)
9/28/2010: Bid Package #3 Addendum #10 Posted to Website
9/29/2010: Bid Package #3 Addendum #11 Posted to Website
Jobsite Activity
September 2010 - Building 6 Elevator Pit